Add Bids
Search By Category/Country/Location by state
Bid Entry Form
Bid Title:
City:
Location by state:
Select Country/Location by state
Alabama
Alaska
American Samoa
Arizona
Arkansas
Baker Island
California
Colorado
Connecticut
Delaware
District of Columbia
Florida
Georgia
Guam
Hawaii
Howland Island
Idaho
Illinois
Indiana
Iowa
Jarvis Island
Johnston Atoll
Kansas
Kentucky
Kingman Reef
Louisiana
Maine
Maryland
Massachusetts
Michigan
Midway Atoll
Minnesota
Mississippi
Missouri
Montana
Navassa Island
Nebraska
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Northern Mariana Islands
Ohio
Oklahoma
Oregon
Palmyra Atoll
Pennsylvania
Puerto Rico
Rhode Island
South Carolina
South Dakota
Tennessee
Texas
United States Minor Outlying Islands
United States Virgin Islands
Utah
Venezuela
Vermont
Vietnam
Virginia
Wake Island
Washington
West Virginia
Wisconsin
Wyoming
Yemen
Category:
Select Category
Accounting/Audit/Administration
Business Consulting
Construction
Educational Services
Engineering
Food Catering Services
Healthcare/Medical Supplies
Janitorial
Landscaping
Legal
Logistics
Professional Services
Real Estate
Transportation Services
Tree Removing Service
Agency Contact Information:
Phone Number:
Bid/Proposal Due Date:
Bid Close Date:
Bid Walkthrough Date:
Estimate:
Term:
Classifications:
Description:
Veterans Point Trail Rehabilitation Project Solicitation Number: 1240LT26Q0015 Department/Ind. Agency: AGRICULTURE, DEPARTMENT OF Sub-Tier: FOREST SERVICE Office: USDA FOREST SERVICE-SPOC IM Location: Custer, SD 57730 Notice Type: Synopsis/Solicitation Amendment Posted Date: 2/18/2026 Response Date: 3/24/2026 9:00 AM Archive Date: 4/8/2026 Links Updated: 2/23/2026 10:44 AM Set Aside: Total Small Business Classification Code: Z - Maintenance, repair, and alteration of real property PSC Code: Z1LB (MAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS) NAICS: 237310 - Highway, Street, and Bridge Construction Last Change: 2/23/2026 10:44 AM PROJECT: VETERANS POINT TRAIL REHABILITATION PROJECT - BLACK HILLS NATIONAL FOREST 02/18/2026: AMENDMENT THREE (AMEND 0003) POSTING: Additional Site Vist will be held - See A0003 for complete details. The due dates for Questions and Quotes have been extended - See A0003 for complete details. This amendment also includes answers to previous vendor's questions. (See the Attachments/Links for A0003 and previously uploaded documents in association with this project.) 02/12/2026: AMENDMENT TWO (AMEND 0002) POSTING: See the Amend 0002_Summary of Changes and read in its entirety. This amendment includes answers to vendor's questions. (See the Attachments/Links for these documents.) Quotes are due by 9:00 a.m. Central Time on Februrary 24, 2026. Refer to Attach 1 - Solicitation for information regarding quote submissions. 02/10/2026: AMENDMENT ONE (AMEND 0001) POSTING: See the Amend 0001_Summary of Changes and read in its entirety. In addition, see Attach 6. the Updated Wage Determination_SD20260001 dated 01.30.2026. This Wage Determination replaces the initial Atach 6, Wage Determination_SD20260032_01.02.26. (See the Attachments/Links for these documents.) Quotes are due by 9:00 a.m. Central Time on Februrary 24, 2026. Refer to Attach 1 - Solicitation for information regarding quote submissions. Veterans Point Trail is an asphalt trail with metal railing and timber retaining walls that provide access from the parking area to fishing piers and viewpoints at Pactola Reservoir. As the trail switchbacks its way to from the parking area to the shoreline, the contractor should be aware of the steep slopes and limited working area. The asphalt trail is deteriorating, with severe oxidation, cracks, heaving, and undercutting in the asphalt. The retaining walls are leaning and no longer keep material off the Trail. This project will fill and seal the cracks, reconstruction select sections, stabilize eroding areas, and apply a seal coat to the asphalt. Timber retaining walls will be removed and reconstructed with segmental concrete block retaining walls. The pipe railing is damaged in some areas. This project will also repair the damaged sections of railing and eliminate sections where the railing is not needed. The Project will also construct reinforcement with gabion (wire rock baskets) to repair eroded sections at the trails edge and bridge abutments. Existing timber retaining walls will be removed. New larger retaining walls will be constructed. An overlook near water’s edge will be eliminated. Tables, benches, and pedestal fire grills will be removed (though new tables and benches are planned for the site as separate work). From the Bridge, a 1,014 ft loop provides access to an inlet. This Loop is referenced in this project as “Lakeshore Loop”. Work on this loop is in the OPTIONAL Bid Items and includes crack sealing, asphalt seal coat, and 620 square feet of segmental retaining wall. The Trail is approximately 2,959 feet long, with a descent of approximately 50 feet from the parking lot to the lowest point. It is a paved trail on the North side of Pactola Reservoir Dam, providing access to the water’s edge. Veterans Point Trail is located on Highway 385, just North of Pactola Reservoir, Pennington County, South Dakota. The Latitude and Longitude coordinates for the Trailhead are: 44° 4'55.88"N, 103°29'37.09"W. The elevation of the site is approximately 4,580 feet above mean sea level. The site generally experiences moderate snowfalls beginning in October and November and ending in April. See Attach 1, SOW, SOI, SPECS, and DRAWINGS for more details regarding this project. Contracting Office Address SPOC Intermountain, Washington, DC 80401 Place of Performance Custer, SD 57730 Contact Information Janice King janice.king@usda.gov Lucas Dahlman lucas.dahlman@usda.gov Main Email janice.king@usda.gov
Submit Bid